11: Handover and Close Out
This phase focuses on the successful handover of the completed building, in line with the project program, and includes completing initial aftercare tasks.
12: In Use
This involves a post-occupancy evaluation of the building to determine the project’s performance. It is also when facilities and asset management are implemented.
9: Finishing
Doors, windows, sanitary, toiletry, flooring, kitchen, lighting, switches, sockets etc
10: Services & Comms
Services like power and water infrastructure, drainage, sewage and communication networks
8: MEP, Fire & Saftey
Mechanical, electrical, plumbing, fire and safety fittings
7: Superstructure
Civil structure, basement floor to 21st floor, slabs, columns & walls
6: Substructure Stage
275 piles installations begins, pile integrity testing and pile load testing, pile cap installation and basement floor
5: Manufacturing & Construction Phase
This stage is when the actual process of building starts. This includes manufacturing building systems and erecting any components of the building that have been made off-site. During Stage 5, the designer should also carry out site inspections and compile quality reports.
4: Technical Design
Stage 4 involves refining the architectural, building services, and structural engineering designs in greater detail. Technical designs will be developed. Designs by any specialist subcontractors will be completed.
3: Spatial Coordination
The concept design will be further developed, and the architectural, building services, and structural engineering designs are coordinated and checked by the lead designer.